 concealed air-conditioning installation stages!

In view of the connection of hidden air-conditioning works to the various stages of construction, starting from building walls and ending with paints, coordination must be made at each stage of construction with the decoration engineer or the supervisor responsible for that stage. Beginning: The Studies Department at Nefal is working on designing executive plans for air conditioning, which show the locations of the indoor units and the path Duct, air outlets (Grill), places for planting copper pipes, and places for outdoor units on the plan, and then they are sent to the customer For review and approval of the establishments After approving the plan for the establishment, the following stages will be carried out according to the readiness of the site:
  • Cultivation of pipes through which copper passes during the construction stages for each floor separately and before the casting of ceilings or retaining walls, starting from the basement, if any.
  • Establishment of air conditioner water drainage pipes to the nearest drainage point.
  • Install the thermostat wires.
  • Marking openings in walls
The studies department matches the executive plans with the gypsum ceiling plans sent by the interior designer, and after completing them, they are sent back to the owner for final approval. After the plan is approved in its final form, the following stages are carried out according to the readiness of the site and the desire of the customer:
  • Installing indoor units and connecting them to water drainage pipes, thermostat wires, and copper connections.
  • Detailing air ducts (Ducts) and Plenum Boxes at the Nafal factory, then supplying and isolating them at the site and installing them, including flexible connections and all dampers, all according to international specifications (SMACNA)
  • Installation of external units on the roofs according to the places previously agreed upon with the client, and they are often on the last upper roof, and they are installed after completing the process of tiling and isolating the roof
  • Finally, the grill is installed after the first layer of paint.
  • Then install the thermostat and make sure of the electrical connections.
  • Finally, the initial operation for a period of 72 hours to ensure the effectiveness and efficiency of the air conditioning.

Hidden-block-heading-features!

The possibility of directing the air to more than one area through the air ducts “Duct” The absence of noise resulting from the indoor unit due to its distance from the air-conditioned place and its presence often in the corridors It is easier to maintain and less in electricity consumption compared to central air conditioning The cost of its installation is average compared to other systems

IMPORTANT POINTS about the hidden adaptor!

For each of the air-conditioning systems, there is a “hidden air-conditioning,” and Central air conditioning, and also desert” Architectural and construction requirements that must be taken into account when choosing the appropriate air conditioning system. Indoor units and air ducts, a space in the false ceiling must be taken into consideration when designing. For example, the height of indoor units and air ducts ranges between (30 cm to 50 cm). Then comes the gypsum works, which also occupy a space of about 10 cm. The ceiling height must be taken into account, not less than 3.50 meters, to accommodate these spaces.

For any other-enquiries!

Boroda Air Conditioning offers all solutions and proposals for the implementation of commercial and residential hidden air conditioning systems projects in various parts of the Kingdom, as we are one of the largest authorized distributors of international air conditioning brands. Do not hesitate to request a price quote, or any inquiries about the hidden air conditioning system, or any other air conditioning system. Our engineers are waiting for your request and assistance. Just click on “Apply for service“, or call us 0535266628